Daily Update

Document 79

{gallery}http://www.flickr.com/photos/doddletrunk/sets/72157625764627875/{/gallery}

  • routing second floor electrical circuits from basement through first floor
  • design and installation of media center in re-purposed fireplace

Document 78

{gallery}http://www.flickr.com/photos/doddletrunk/sets/72157625524165837/{/gallery}

  • construct vanity/toilet partition wall
  • install blocking and strapping
  • complete 2nd floor interior framing
  • level shower receptor
  • install toilet vent
  • complete main vent

Document 76

{gallery}http://www.flickr.com/photos/doddletrunk/sets/72157625524136447/{/gallery}

  • route custom warmboard channels
  • install pex-al-pex radiant tubing

Document 77

{gallery}http://www.flickr.com/photos/doddletrunk/sets/72157625649721136/{/gallery}

  • frame south bedroom wall
  • install electric winch and adapter to crane trolley
  • utilize crane to hoist 3/4" plywood decking to 2nd floor
  • document ponding on deck
  • frame bathroom wall and attic
  • deck attic
  • frame and install bathroom pocket door
  • cut 6" diameter hole in subfloor around shower drain for shower receptor clearance
  • utilize crane to hoist shower receptor to 2nd floor
  • rough in vanity drain and vanity/shower combination vent
  • install pocket lights in bathroom and bathroom/master entry

Document 75

{gallery}http://www.flickr.com/photos/doddletrunk/sets/72157625664825038/{/gallery}

  • complete spiral staircase railing, spindles, and treads
  • landscape east walkway
  • paint 2nd floor south exterior
  • frame former firebox surround
  • paint and install staircase doors and main floor bedroom door