Day 5

{gallery}http://www.flickr.com/photos/doddletrunk/sets/72157622386366163/{/gallery}

10/02/2009

  • electrical inspection ground rod (passed)
  • re-bar doweling with epoxy inspection (passed)
  • clean and stack chimney bricks for reuse

Day 4

{gallery}http://www.flickr.com/photos/doddletrunk/sets/72157622498481452/{/gallery}

10/01/2009

  • drilling of existing footing for rebar dowling
  • move shoring up to accommodate stepped footing
  • chimney demo

Day 2

{gallery}http://www.flickr.com/photos/doddletrunk/sets/72157622488087968/{/gallery}

09/29/2009

  • concrete slab removal/recycle
  • earth removal/recycle for footings

Day 3

{gallery}http://www.flickr.com/photos/doddletrunk/sets/72157622373878767/{/gallery}

09/30/2009

  • temporary relocation of electrical panel
  • wrap service wires at electrical pole
  • build scaffold for chimney removal
  • low-voltage wiring temporary removal

Day 1

{gallery}http://www.flickr.com/photos/doddletrunk/sets/72157622356161653/{/gallery}

09/28/2009

  • concrete slab cutting
  • concrete slab removal/recycle