- wire lighting in stairwell, one light per landing ( 3 total ) 4-way switch at first floor, 3-way switches at 2nd floor and basement
- remove existing drywall in stairwell
- complete insulation of stairwell, first floor
- complete framing in stairwell in preparation for drywall: blocking for railing, blocking at landings, plywood furring of south wall at second floor to match first floor depth, reset stud at west wall 2nd floor, shim various studs
- install recycled drywall in stairwell: hang, mud, tape, sand, prime
- paint stairwell, 2 coats rolled Martha Stewart Chalk, applied to Behr satin interior base
- complete paint on exterior first floor
- paint spiral stair treads, landings, poles and baseplate with 2 coats rolled, ACE Rust Stop enamel, Ford Gray
- install spiral stair baseplate, pole, landings and treads ( loose )
Document 73
- Details
- Created on Sunday, 25 July 2010 14:22
- Last Updated on Saturday, 16 February 2013 05:34
- Written by Administrator
- Hits: 1248
{gallery}http://www.flickr.com/photos/doddletrunk/sets/72157624348729648/{/gallery}
- construct south porch
- complete pad and steps at west porch
- clear remaining concrete walkway near west porch
- add 5/8" clear crushed rock around west porch
- reseed front lawn
- begin painting house at first floor south, Sherwin-Williams Duration, 2 coats rolled, color Sequin
- install custom, stainless house numbers
Document 71
- Details
- Created on Wednesday, 14 April 2010 17:53
- Last Updated on Saturday, 16 February 2013 05:34
- Written by Administrator
- Hits: 1251
{gallery}http://www.flickr.com/photos/doddletrunk/sets/72157623853254172/{/gallery}
- install central vacuum, with stub to 2nd floor
- 1/2 round galvalume gutter installation
- remove remaining concrete from west walkway
- install raised beds ( stock tanks )
Document 72
- Details
- Created on Monday, 10 May 2010 14:05
- Last Updated on Saturday, 16 February 2013 05:34
- Written by Administrator
- Hits: 1294
{gallery}http://www.flickr.com/photos/doddletrunk/sets/72157624029679426/{/gallery}
- install edging and 5/8" clear crushed rock around raised beds at south face
- install footings and ledgers for south and west porches
- construct west porch deck and railing
- move temporary south steps to west, in preparation for south porch construction
Day 70
- Details
- Created on Sunday, 21 February 2010 16:54
- Last Updated on Saturday, 16 February 2013 05:34
- Written by Administrator
- Hits: 711
{gallery}http://www.flickr.com/photos/doddletrunk/sets/72157623472884016/{/gallery}
02/16/2010
- re-install siding at greenroof corners